![]()
DECK-CEE
RE-ROOF SYSTEM
CLIPS AND CEES SUPPORT NEW
ROOFS OVER "OLD" METAL ROOFS
| USER FRIENDLY CLIPS AND TUBES EASILY STOCKED |
![]() |
![]() |
![]() |
TWO COMPONENTS FOR ANY TYPE OF "OLD" METAL ROOF |
ERECTION
PROCEDURE |
||||
THE CLIPS AND CEES FOR THIS "SIMPLE" RE-ROOF SYSTEM ARE READILY AVAILABLE AND ARE COMBINED TO FUNCTION AS THE BASE FOR YOUR NEW METAL ROOF. THE SIZE OF THE CEE USED IS A FUNCTION OF THE SPACING OF THE ROOF PURLINS AND THE SPACING OF THE CLIPS.
THE STANDARD ZEE CLIP IS 3" DEEP AND CLEARS THE DEPTH OF MOST EXISTING METAL ROOFS. ADDITION OF THE DEPTH OF THE CEE ALLOWS FOR THE INSERTION OF INSULATION.
THE TABLE BELOW LISTS THE DESIGN CRITERIA OF THE CEE. A SIMPLE CALCULATION OF THE STRESS IN THE CEE ENABLES YOU TO DETERMINE THE SPACING OF THE CLIPS.
| CEE SECTION |
THICKNESS GAUGE |
FY | MOMENT OF INERTIA |
SECTION MODULUS |
Mr (FT-LB) |
| 1-1/2" X 3-1/2" | 18 | 45 | 0.175 | 0.171 | 423 |
THE SIMPLICITY OF THE SYSTEM ASSURES LOW LABOR COSTS. THE COST OF THE COMPONENTS IS LESS THAN 40¢ / S.F.
| EXAMPLE: ASSUME
(a) = 5' CALCULATION: |
STRESS FORMULA: f = 1/10 (c) x (a) x (b)2 x 12 section modules (a) = SPACING OF ROOF PURLINS Note: ALLOWABLE STRESS IS 30,000 p.s.i. |
| -- CONTACT US FOR PRICING ON INDIVIDUAL PROJECTS -- |
If you should have any questions concerning Decks, Inc. or how we may help your company, feel free to use any of the following means:
| frankc@roofdecks.net | |
| snail mail | Decks, Incorporated PO Box 278 Woodstock, IL 60098 |
| Telephone | 815-337-2030 |
| Fax | 815-337-2031 |